PROJECT NAME |
COMPANY |
SCHEDULE |
Operating & Maintenance | Pertagas | Feb ’13 – Jan ’15 |
Operating & Maintenance | Pertagas | Feb ’15 – Jan ’17 |
Maintenance for EGD (Man power Supply, Tools & Equipment) | PT. Chandra Asri Petro Chemical | Jul ’10 – Jul ’11 |
Maintenance for EGD (Man power Supply, Tools & Equipment) | PT. Chandra Asri Petro Chemical | Jul ’10 – Jul ’12 |
Maintenance for EGD (Man power Supply, Tools & Equipment) | PT. Chandra Asri Petro Chemical | Jul ’10 – Des ’13 |
Routine Daily Maintenance | PT. Chandra Asri Petro Chemical | Apr ’13 – Mar ’14 |
Routine Daily Maintenance | PT. Chandra Asri Petro Chemical | Apr ’14 – Mar ’15 |
Routine Daily Maintenance | PT. Chandra Asri Petro Chemical | Apr ’15 – Mar ’16 |
Man power Supply | PT. Titan Petrokimia Nusantara | Nop ‘08 – Oct ’10 |
Man power Supply | PT. Titan Petrokimia Nusantara | Nop ‘10 – Oct ’12 |
Field Operation Assistance Services | ConocoPhillips (Grissik) Ltd | Nop’ 14 – Nop’16 |
Provision of Daily Plant Services | PT. BP Petrochemicals Indonesia | ’ Feb '16 – Feb ’17 |
No | PROJECT NAME | COMPANY | SCHE | Start | End |
---|---|---|---|---|---|
1 | Sub Sea Bolt Tensioning off Shore | Pertamina Hulu Energy | May '10 | 10 | 10 |
2 | Loosening & Tightening Bolts of 1-E-400 | Titan Nusantara | Dec '11 | 11 | 11 |
3 | Loosening & Tightening Bolts of 1-E-400/401 | Titan Nusantara | Jun '12 | 12 | 12 |
4 | Loosening & Tightening Bolts Of 3-E400/401 | Titan Nusantara | Jul '12 | 12 | 12 |
5 | Loosening & Tightening Bolts Of E400 | Titan Nusantara | Sep '12 | 12 | 12 |
6 | Loosening & Tightening Service of bottom bolts of 3-E-401 & Butterfly valve 38” | Titan Petrokimia Nusantara | Feb '08 | 8 | 8 |
7 | Loosening & Tightening Bolts Of 3-E400/401 | Titan Petrokimia Nusantara | May '09 | 9 | 9 |
8 | Catalyst Skimming | Kaltim Pasifik Ammonia | Mar '12 | 12 | 12 |
9 | Turn Around - Catalyst Replacement of Dryers Ethelen Plant FF-201A, 2021B, 301A, 301 B & Replacement Deoxo Vessels C-1109, C-209 & Driyers C-1110, C-1112, C-2112 | Chandra Asri Petro Chemical | Oct '11 | 11 | 11 |
10 | Catalyst Skimming | TPPI | Dec '11 | 11 | 11 |
11 | Unloading & Loading Catalyst Reformer 701-702 | Pertamina UP II, Dumai | Oct '07 | 7 | 7 |
12 | Unloading & Loading Catalyst Reformer 22-F-101 | Pertamina UP VI, Balongan | Apr '07 | 7 | 7 |
13 | Unloading / Loading Catalyst Reformer | Pertamina UP VI, Balongan | Oct '08 | 8 | 8 |
14 | Unloading and Replacement Charcoal Vessel Tag.No.615–FT–102 | PetoChina Int’l Ltd Jabung | Jan '09 | 9 | 9 |
15 | Turn Around - Change Out Catalyst (COC) Atmospheric Hydrotreathing Module II. (Unit 12-R-101, R-102, R-103). | Pertamina UP VI, Balongan | Jul '06 | 6 | 6 |
16 | Turn Around - Change Out Catalyst (COC) Atmospheric Hydro treating Module I. ( Unit 12-R-101, R-102, R-103 ) Hydrotreathing Module II. ( Unit 13-R-101, R-102, R-103 ) | Pertamina UP VI, Balongan | Feb '08 | 8 | 8 |
17 | Turn Around - Change Out Catalyst (COC) Atmospheric | Pertamina UP VI, Balongan | Oct '08 | 8 | 8 |
18 | Turn Around - Change Out Catalyst (COC) Atmospheric Hydrotreathing Module I . (Unit 12-R-101, R-102, R-103) Module II. ( Unit 13-R-101, R-102, R-103 ) | Pertamina UP VI, Balongan | Mar '10 | 10 | 10 |
19 | Unloading & Loading Catalyst 211-V-1 & 211-V-2 | Pertamina UP II, Dumai | May '07 | 7 | 7 |
20 | Skimming Catalyst : 13-R 101 & 14-R-101 | Pertamina UP VI, Balongan | Oct '06 | 6 | 6 |
21 | Unloading & Loading Catalyst Vessel 33-V-103 | Pertamina UP VI, Balongan | Mar '07 | 7 | 7 |
22 | Turn Around - Change Out Catalyst Absorbent 32-V-106 | Pertamina UP VI, Balongan | Mar '08 | 8 | 8 |
23 | Turn Around - Change Out Catalyst 32-V-106 | Pertamina UP VI, Balongan | Oct '08 | 8 | 8 |
24 | Unloading & Loading Catalyst Reactor : R-410 & R-610 | Petro Oxo Nusantara | Sept '06 | 6 | 6 |
25 | Catalyst Replacement | Petro Oxo Nusantara | May '09 | 9 | 9 |
26 | Replacing 2 nd Bed Center Screen & Replacing Catalyst (57,4 M3) | Pupuk Kaltim | Jun-Jul '11 | 11 | 11 |
27 | Unloading Catalyst HTU 260-R-101 (Hydro Treating Unit) | Pertamina Cilacap | Jul '10 | 10 | 10 |
28 | Turn Around - Cleaning & repairing of Quench Tower DA-102, Coustic/Water wash Tower DA-202 & Gasoline Fractionators DA-101 | Chandra Asri Petro Chemical | Oct '11 | 11 | 11 |
29 | Turn Around - Replacement & Cleaning Pall Ring DA-101 & DA-202 | Chandra Asri Petro Chemical | Apr '07 | 7 | 7 |
30 | Chandra Asri Turn Around ----------Cleaning & repairing of Quench Tower DA-102, Coustic/Water wash Tower DA-202 & Gasoline Fractionators DA-101 | Chandra Asri Petro Chemical | Oct '11 | 11 | 11 |
31 | Decanting Spent Memguard Absorbent and loading Fresh Adsorbent Into Memguard Towers 610-V-202 A/B & | PetroChina Int’l Ltd Jabung | Apr-May '11 | 11 | 11 |
32 | Mol sieve & Memguard Tower Decanting & Reloading Services -----610 V 202 A/B 615 V 204 A/B | PetroChina Int’l Ltd Jabung | Jan '09 | 9 | 9 |
33 | Decanting Spent Molecular Sieve Adsorbent and loading Fresh Adsorbent Into Mol Sieve Towers 615-V-204-A/B | PetroChina Int’l Ltd Jabung | Apr-May '11 | 11 | 11 |
34 | Decanting Spent Memguard Absorbent and loading Fresh Adsorbent Into Memguard Towers 610-V-202 A/B & | PetroChina Int’l Ltd Jabung | Apr-May '11 | 11 | 11 |
35 | Provision of Molecular Sieve Change Out Service | HESS Pangkah | July '12 | 12 | 12 |
36 | Thermal Swing Adsorber 21-V-101A-D/21-V-201A-D-Adsorbent Change Out | CocoPhillips (Grissik) | Oct-Nov '09 | 9 | 9 |
37 | Thermal Swing Adsorber 21-V-101A-D/21-V-201A-D-Adsorbent Change Out | CocoPhillips (Grissik) | Dec '15 | 15 | 15 |
38 | Amin Carbon Replacement | BP.Tangguh | July '14 | 14 | 14 |
39 | Amin Carbon Replacement | BP.Tangguh | Dec '14 | 14 | 14 |
40 | Loading Catalyst MS-Adsorber 2601.01A.BA1-2601.01B.BA1 | Linde – Cilegon | July '13 | 13 | 13 |
41 | Pig Launcher & Receiver | Chevron Pacific Indonesia | Ock ’09-Des ’10 | 9 | 10 |
42 | Damper | Chandra Asri Petro Chemical | Oct '15 | 15 | 15 |
43 | Turn Around – Piping Strainer | Chandra Asri Petro Chemical | Oct '15 | 15 | 15 |
44 | Cleaning Tube Bundle | CocoPhillips (Grissik) | Dec '15 | 15 | 15 |
45 | BLC Heat Exchanger Cleaning & Repair Project | Pertamina UP VI, Balongan | Oct '08 | 8 | 8 |
46 | Pertamina RU VI Balongan Turn Around --------- Inspection, cleaning, repair at BLC HE 12-E-102 A/B, 12-E-103 A/B, 13-E-101 A/B, 13-E-102 A/B, 13-E-103 A/B, COC di Reformer 22-F-101, COC 32-V-106, COC ARHDM 12-R-101/102/103 and Cleaning & repair CDU-HE | Pertamina UP VI, Balongan | Nov '08 | 8 | 8 |
47 | On line Cleaning of Air Cooled HE (Fin Fan) | BP.Tangguh | Apr '11 | 11 | 11 |
48 | Cleaning Internal Tube | BP.Tangguh | Jun '14 | 14 | 14 |
49 | Air Cooled Heat Exchanger Service | BP.Tangguh | Jul ’12-Sep ’14 | 12 | 14 |
50 | Tube Bundle Maintenance Services | CocoPhillips (Grissik) | 24 Dec ‘13-Mar ’16 | 13 | 16 |
51 | Fan Cooler Maintenance Services | CocoPhillips (Grissik) | 07 Mar‘14-Mar’17 | 14 | 17 |
52 | Naphta Tank | Chandra Asri Petro Chemical | Mar ’15 | 15 | 15 |
53 | Tank Cleaning | Chandra Asri Petro Chemical | Oct '15 | 15 | 15 |
54 | Off line Cleaning Furnace FB 106 | Chandra Asri Petro Chemical | Jul '11 | 11 | 11 |
55 | Pasivation Off line Furnace FB 108 B | Chandra Asri Petro Chemical | Aug '07 | 7 | 7 |
56 | Expander Tube | Pupuk Kaltim | Nov '10 | 10 | 10 |
57 | Paket Pekerjaan Turn Around ( TA ) 2014 dan Perbaikan Pondasi Pipe Support | Nusantara Regas | Jul-Oct ‘14 | 14 | 14 |
58 | Turn Around - Pipeline And Equipment Repainting At Ethyllene And Utility Plant | Chandra Asri Petro Chemical | Oct '11 | 11 | 11 |
59 | Paket Turn Around | Nusantara Regas | Jul '13 | 13 | 13 |
60 | Paket Turn Around | Nusantara Regas | Jul '14 | 14 | 14 |
61 | Regas Turn Around ------Instalasi gas filter, Pemasangan Spectacle blind. ------Civil work : Pemasangan Facade , penambahan kanopi, penambahan lantai grating, pembuatan pintu akses | Nusantara Regas | Aug '15 | 15 | 15 |
62 | Regas Turn Around ----Site Survey, Engineering, Procurement, Pabrikasi, konstruksi & Instalasi Modifikasi platform, modifikasi dan penambahan valve instrument, modifikasi line CO2 snuffing package, modifikasi needle valve, penggantian insolasi gasket metering package 620 Psi dan 350 Psi, penggantian flange dan penggantian 12” #600 & 18” #300 bolt valve dan Actuator. | Nusantara Regas | Jul '13 | 13 | 13 |
63 | Regas Turn Around ------Pabrikasi, Konstruksi, Instalasi dan Pengadaan Material ------------Filter sparator : Pabrikasi drain line pada spool filter, pelepasan spool bypass line 306-F-01B, pemasangan filter sparator 306-F-01B serta spool pendukungnya, pelepasan filter sparator 306-F-01A. Verifikasi spool bypas line, pemasangan spool bypass line di 306-F-01A dan perubahan posisi valve VV-17/21 menjadi 45 degree ------Civil work : Pipe support, shallow foundation, platform, hand reel, general infastructur, infrastructur electrical & instrument, pabrikasi trolley tabung Co2, pemasangan sampling point, exhaust stack, indirect fired water bath heater ( IFWBH). | Nusantara Regas | Jul '14 | 14 | 14 |
64 | Major Overhaul Perkins Gas Engine Generator Services | CocoPhillips (Grissik) | Dec ’14-Dec ’15 | 14 | 15 |
65 | Jalan Tol Cipularang | WASKITA KARYA | 2004-2005 | 4 | 5 |
66 | Corrossion Assessment | Pertamina EP Limau | Feb '10 | 10 | 10 |
67 | Installation & Piping Work | TPPI | Jul '08 | 8 | 8 |
68 | Repainting Work | Chandra Asri Petro Chemical | Oct '11 | 11 | 11 |
69 | Repair Minimum Flow Jet Nozzle | TPPI | Jun '08 | 8 | 8 |
70 | Replacement & Support Chimney Tray | TPPI | Apr '08 | 8 | 8 |
71 | Cleaning & Brushing Install New Tray | TPPI | Jun '08 | 8 | 8 |
72 | Modification Muffler Flare Stack | TPPI | Arp '08 | 8 | 8 |
73 | Reconditioning Of Ammonia Converter D-1101 Kaltim-1 | Pupuk Kaltim | Jun-Jul '11 | 11 | 11 |
74 | Tank Repair | Chevron Pacific Indonesia | Sep’09-Dec’10 | 9 | 10 |
75 | Tray Column Repair & Internal Cleaning Tag. No. 1026-501 | Indorama Synthetics Tbk | Dec '08 | 8 | 8 |
76 | Probing UFPP & Probing Finisher | Indorama Synthetics Tbk | Sep’09-Dec’10 | 9 | 10 |
77 | Repair & Replacement Tray | SDK, Subang | May '09 | 9 | 9 |
78 | Build Absorbent Facilities CPI PS1 & PS2 | Styrindo Mono Indonesia | Nov '15-Feb'16 | 15 | 16 |
79 | Operating & Maintenance | Pertagas | Feb ’13-Jan’15 | 13 | 15 |
80 | Operating & Maintenance | Pertagas | Feb ’15-Jan’17 | 15 | 17 |
81 | Maintenance for EGD (Man power Supply, Tools & Equipment) | Chandra Asri Petro Chemical | Jul’10-Jul’11 | 10 | 11 |
82 | Maintenance for EGD (Man power Supply, Tools & Equipment) | Chandra Asri Petro Chemical | Jul’10-Jul’12 | 10 | 12 |
83 | Maintenance for EGD (Man power Supply, Tools & Equipment) | Chandra Asri Petro Chemical | Jul’10-Dec’13 | 10 | 13 |
84 | Routine Daily Maintenance | Chandra Asri Petro Chemical | Apr’13-Mar’14 | 13 | 14 |
85 | Routine Daily Maintenance | Chandra Asri Petro Chemical | Apr’14-Mar’15 | 14 | 15 |
86 | Routine Daily Maintenance | Chandra Asri Petro Chemical | Apr’15-Mar’16 | 15 | 16 |
87 | Man power Supply | Titan Petrokimia Nusantara | Nov‘08-Oct’10 | 8 | 10 |
88 | Man power Supply | Titan Petrokimia Nusantara | Nov‘10-Oct’12 | 10 | 12 |
89 | Field Operation Assistance Services | CocoPhillips (Grissik) | Nov’14-Nov’16 | 14 | 16 |
90 | EPC Musi Timur | PT. | 2016 | 16 | 16 |
No | PROJECT NAME | COMPANY | SCHE | Start | End |
---|---|---|---|---|---|
1 | Sub Sea Bolt Tensioning off Shore | Pertamina Hulu Energy | May '10 | 10 | 10 |
2 | Loosening & Tightening Bolts of 1-E-400 | Titan Nusantara | Dec '11 | 11 | 11 |
3 | Loosening & Tightening Bolts of 1-E-400/401 | Titan Nusantara | Jun '12 | 12 | 12 |
4 | Loosening & Tightening Bolts Of 3-E400/401 | Titan Nusantara | Jul '12 | 12 | 12 |
5 | Loosening & Tightening Bolts Of E400 | Titan Nusantara | Sep '12 | 12 | 12 |
6 | Loosening & Tightening Service of bottom bolts of 3-E-401 & Butterfly valve 38” | Titan Petrokimia Nusantara | Feb '08 | 8 | 8 |
7 | Loosening & Tightening Bolts Of 3-E400/401 | Titan Petrokimia Nusantara | May '09 | 9 | 9 |
8 | Catalyst Skimming | Kaltim Pasifik Ammonia | Mar '12 | 12 | 12 |
9 | Turn Around - Catalyst Replacement of Dryers Ethelen Plant FF-201A, 2021B, 301A, 301 B & Replacement Deoxo Vessels C-1109, C-209 & Driyers C-1110, C-1112, C-2112 | Chandra Asri Petro Chemical | Oct '11 | 11 | 11 |
10 | Catalyst Skimming | TPPI | Dec '11 | 11 | 11 |
11 | Unloading & Loading Catalyst Reformer 701-702 | Pertamina UP II, Dumai | Oct '07 | 7 | 7 |
12 | Unloading & Loading Catalyst Reformer 22-F-101 | Pertamina UP VI, Balongan | Apr '07 | 7 | 7 |
13 | Unloading / Loading Catalyst Reformer | Pertamina UP VI, Balongan | Oct '08 | 8 | 8 |
14 | Unloading and Replacement Charcoal Vessel Tag.No.615–FT–102 | PetoChina Int’l Ltd Jabung | Jan '09 | 9 | 9 |
15 | Turn Around - Change Out Catalyst (COC) Atmospheric Hydrotreathing Module II. (Unit 12-R-101, R-102, R-103). | Pertamina UP VI, Balongan | Jul '06 | 6 | 6 |
16 | Turn Around - Change Out Catalyst (COC) Atmospheric Hydro treating Module I. ( Unit 12-R-101, R-102, R-103 ) Hydrotreathing Module II. ( Unit 13-R-101, R-102, R-103 ) | Pertamina UP VI, Balongan | Feb '08 | 8 | 8 |
17 | Turn Around - Change Out Catalyst (COC) Atmospheric | Pertamina UP VI, Balongan | Oct '08 | 8 | 8 |
18 | Turn Around - Change Out Catalyst (COC) Atmospheric Hydrotreathing Module I . (Unit 12-R-101, R-102, R-103) Module II. ( Unit 13-R-101, R-102, R-103 ) | Pertamina UP VI, Balongan | Mar '10 | 10 | 10 |
19 | Unloading & Loading Catalyst 211-V-1 & 211-V-2 | Pertamina UP II, Dumai | May '07 | 7 | 7 |
20 | Skimming Catalyst : 13-R 101 & 14-R-101 | Pertamina UP VI, Balongan | Oct '06 | 6 | 6 |
21 | Unloading & Loading Catalyst Vessel 33-V-103 | Pertamina UP VI, Balongan | Mar '07 | 7 | 7 |
22 | Turn Around - Change Out Catalyst Absorbent 32-V-106 | Pertamina UP VI, Balongan | Mar '08 | 8 | 8 |
23 | Turn Around - Change Out Catalyst 32-V-106 | Pertamina UP VI, Balongan | Oct '08 | 8 | 8 |
24 | Unloading & Loading Catalyst Reactor : R-410 & R-610 | Petro Oxo Nusantara | Sept '06 | 6 | 6 |
25 | Catalyst Replacement | Petro Oxo Nusantara | May '09 | 9 | 9 |
26 | Replacing 2 nd Bed Center Screen & Replacing Catalyst (57,4 M3) | Pupuk Kaltim | Jun-Jul '11 | 11 | 11 |
27 | Unloading Catalyst HTU 260-R-101 (Hydro Treating Unit) | Pertamina Cilacap | Jul '10 | 10 | 10 |
28 | Turn Around - Cleaning & repairing of Quench Tower DA-102, Coustic/Water wash Tower DA-202 & Gasoline Fractionators DA-101 | Chandra Asri Petro Chemical | Oct '11 | 11 | 11 |
29 | Turn Around - Replacement & Cleaning Pall Ring DA-101 & DA-202 | Chandra Asri Petro Chemical | Apr '07 | 7 | 7 |
30 | Chandra Asri Turn Around ----------Cleaning & repairing of Quench Tower DA-102, Coustic/Water wash Tower DA-202 & Gasoline Fractionators DA-101 | Chandra Asri Petro Chemical | Oct '11 | 11 | 11 |
31 | Decanting Spent Memguard Absorbent and loading Fresh Adsorbent Into Memguard Towers 610-V-202 A/B & | PetroChina Int’l Ltd Jabung | Apr-May '11 | 11 | 11 |
32 | Mol sieve & Memguard Tower Decanting & Reloading Services -----610 V 202 A/B 615 V 204 A/B | PetroChina Int’l Ltd Jabung | Jan '09 | 9 | 9 |
33 | Decanting Spent Molecular Sieve Adsorbent and loading Fresh Adsorbent Into Mol Sieve Towers 615-V-204-A/B | PetroChina Int’l Ltd Jabung | Apr-May '11 | 11 | 11 |
34 | Decanting Spent Memguard Absorbent and loading Fresh Adsorbent Into Memguard Towers 610-V-202 A/B & | PetroChina Int’l Ltd Jabung | Apr-May '11 | 11 | 11 |
35 | Provision of Molecular Sieve Change Out Service | HESS Pangkah | July '12 | 12 | 12 |
36 | Thermal Swing Adsorber 21-V-101A-D/21-V-201A-D-Adsorbent Change Out | CocoPhillips (Grissik) | Oct-Nov '09 | 9 | 9 |
37 | Thermal Swing Adsorber 21-V-101A-D/21-V-201A-D-Adsorbent Change Out | CocoPhillips (Grissik) | Dec '15 | 15 | 15 |
38 | Amin Carbon Replacement | BP.Tangguh | July '14 | 14 | 14 |
39 | Amin Carbon Replacement | BP.Tangguh | Dec '14 | 14 | 14 |
40 | Loading Catalyst MS-Adsorber 2601.01A.BA1-2601.01B.BA1 | Linde – Cilegon | July '13 | 13 | 13 |
41 | Pig Launcher & Receiver | Chevron Pacific Indonesia | Ock ’09-Des ’10 | 9 | 10 |
42 | Damper | Chandra Asri Petro Chemical | Oct '15 | 15 | 15 |
43 | Turn Around – Piping Strainer | Chandra Asri Petro Chemical | Oct '15 | 15 | 15 |
44 | Cleaning Tube Bundle | CocoPhillips (Grissik) | Dec '15 | 15 | 15 |
45 | BLC Heat Exchanger Cleaning & Repair Project | Pertamina UP VI, Balongan | Oct '08 | 8 | 8 |
46 | Pertamina RU VI Balongan Turn Around --------- Inspection, cleaning, repair at BLC HE 12-E-102 A/B, 12-E-103 A/B, 13-E-101 A/B, 13-E-102 A/B, 13-E-103 A/B, COC di Reformer 22-F-101, COC 32-V-106, COC ARHDM 12-R-101/102/103 and Cleaning & repair CDU-HE | Pertamina UP VI, Balongan | Nov '08 | 8 | 8 |
47 | On line Cleaning of Air Cooled HE (Fin Fan) | BP.Tangguh | Apr '11 | 11 | 11 |
48 | Cleaning Internal Tube | BP.Tangguh | Jun '14 | 14 | 14 |
49 | Air Cooled Heat Exchanger Service | BP.Tangguh | Jul ’12-Sep ’14 | 12 | 14 |
50 | Tube Bundle Maintenance Services | CocoPhillips (Grissik) | 24 Dec ‘13-Mar ’16 | 13 | 16 |
51 | Fan Cooler Maintenance Services | CocoPhillips (Grissik) | 07 Mar‘14-Mar’17 | 14 | 17 |
52 | Naphta Tank | Chandra Asri Petro Chemical | Mar ’15 | 15 | 15 |
53 | Tank Cleaning | Chandra Asri Petro Chemical | Oct '15 | 15 | 15 |
54 | Off line Cleaning Furnace FB 106 | Chandra Asri Petro Chemical | Jul '11 | 11 | 11 |
55 | Pasivation Off line Furnace FB 108 B | Chandra Asri Petro Chemical | Aug '07 | 7 | 7 |
56 | Expander Tube | Pupuk Kaltim | Nov '10 | 10 | 10 |
57 | Paket Pekerjaan Turn Around ( TA ) 2014 dan Perbaikan Pondasi Pipe Support | Nusantara Regas | Jul-Oct ‘14 | 14 | 14 |
58 | Turn Around - Pipeline And Equipment Repainting At Ethyllene And Utility Plant | Chandra Asri Petro Chemical | Oct '11 | 11 | 11 |
59 | Paket Turn Around | Nusantara Regas | Jul '13 | 13 | 13 |
60 | Paket Turn Around | Nusantara Regas | Jul '14 | 14 | 14 |
61 | Regas Turn Around ------Instalasi gas filter, Pemasangan Spectacle blind. ------Civil work : Pemasangan Facade , penambahan kanopi, penambahan lantai grating, pembuatan pintu akses | Nusantara Regas | Aug '15 | 15 | 15 |
62 | Regas Turn Around ----Site Survey, Engineering, Procurement, Pabrikasi, konstruksi & Instalasi Modifikasi platform, modifikasi dan penambahan valve instrument, modifikasi line CO2 snuffing package, modifikasi needle valve, penggantian insolasi gasket metering package 620 Psi dan 350 Psi, penggantian flange dan penggantian 12” #600 & 18” #300 bolt valve dan Actuator. | Nusantara Regas | Jul '13 | 13 | 13 |
63 | Regas Turn Around ------Pabrikasi, Konstruksi, Instalasi dan Pengadaan Material ------------Filter sparator : Pabrikasi drain line pada spool filter, pelepasan spool bypass line 306-F-01B, pemasangan filter sparator 306-F-01B serta spool pendukungnya, pelepasan filter sparator 306-F-01A. Verifikasi spool bypas line, pemasangan spool bypass line di 306-F-01A dan perubahan posisi valve VV-17/21 menjadi 45 degree ------Civil work : Pipe support, shallow foundation, platform, hand reel, general infastructur, infrastructur electrical & instrument, pabrikasi trolley tabung Co2, pemasangan sampling point, exhaust stack, indirect fired water bath heater ( IFWBH). | Nusantara Regas | Jul '14 | 14 | 14 |
64 | Major Overhaul Perkins Gas Engine Generator Services | CocoPhillips (Grissik) | Dec ’14-Dec ’15 | 14 | 15 |
65 | Jalan Tol Cipularang | WASKITA KARYA | 2004-2005 | 4 | 5 |
66 | Corrossion Assessment | Pertamina EP Limau | Feb '10 | 10 | 10 |
67 | Installation & Piping Work | TPPI | Jul '08 | 8 | 8 |
68 | Repainting Work | Chandra Asri Petro Chemical | Oct '11 | 11 | 11 |
69 | Repair Minimum Flow Jet Nozzle | TPPI | Jun '08 | 8 | 8 |
70 | Replacement & Support Chimney Tray | TPPI | Apr '08 | 8 | 8 |
71 | Cleaning & Brushing Install New Tray | TPPI | Jun '08 | 8 | 8 |
72 | Modification Muffler Flare Stack | TPPI | Arp '08 | 8 | 8 |
73 | Reconditioning Of Ammonia Converter D-1101 Kaltim-1 | Pupuk Kaltim | Jun-Jul '11 | 11 | 11 |
74 | Tank Repair | Chevron Pacific Indonesia | Sep’09-Dec’10 | 9 | 10 |
75 | Tray Column Repair & Internal Cleaning Tag. No. 1026-501 | Indorama Synthetics Tbk | Dec '08 | 8 | 8 |
76 | Probing UFPP & Probing Finisher | Indorama Synthetics Tbk | Sep’09-Dec’10 | 9 | 10 |
77 | Repair & Replacement Tray | SDK, Subang | May '09 | 9 | 9 |
78 | Build Absorbent Facilities CPI PS1 & PS2 | Styrindo Mono Indonesia | Nov '15-Feb'16 | 15 | 16 |
79 | Operating & Maintenance | Pertagas | Feb ’13-Jan’15 | 13 | 15 |
80 | Operating & Maintenance | Pertagas | Feb ’15-Jan’17 | 15 | 17 |
81 | Maintenance for EGD (Man power Supply, Tools & Equipment) | Chandra Asri Petro Chemical | Jul’10-Jul’11 | 10 | 11 |
82 | Maintenance for EGD (Man power Supply, Tools & Equipment) | Chandra Asri Petro Chemical | Jul’10-Jul’12 | 10 | 12 |
83 | Maintenance for EGD (Man power Supply, Tools & Equipment) | Chandra Asri Petro Chemical | Jul’10-Dec’13 | 10 | 13 |
84 | Routine Daily Maintenance | Chandra Asri Petro Chemical | Apr’13-Mar’14 | 13 | 14 |
85 | Routine Daily Maintenance | Chandra Asri Petro Chemical | Apr’14-Mar’15 | 14 | 15 |
86 | Routine Daily Maintenance | Chandra Asri Petro Chemical | Apr’15-Mar’16 | 15 | 16 |
87 | Man power Supply | Titan Petrokimia Nusantara | Nov‘08-Oct’10 | 8 | 10 |
88 | Man power Supply | Titan Petrokimia Nusantara | Nov‘10-Oct’12 | 10 | 12 |
89 | Field Operation Assistance Services | CocoPhillips (Grissik) | Nov’14-Nov’16 | 14 | 16 |
90 | EPC Musi Timur | PT. | 2016 | 16 | 16 |