PROJECT NAME

COMPANY

SCHEDULE

Pig Launcher &  Receiver PT. Chevron Pacific Indonesia Ock ’09 – Des’10
Damper PT. Chandra Asri Petro Chemical Oct’ 15
Turn Around – Piping  Strainer PT. Chandra Asri Petro Chemical Oct-15
Cleaning Tube Bundle ConocoPhillips (Grissik) Ltd Dec’15
BLC Heat Exchanger Cleaning & Repair Project PT. Pertamina UP VI, Balongan Oct-08
Turn Around

Inspection, cleaning, repair at BLC HE 12-E-102 A/B, 12-E-103 A/B, 13-E-101 A/B, 13-E-102 A/B, 13-E-103 A/B, COC di Reformer 22-F-101, COC 32-V-106, COC ARHDM 12-R-101/102/103 and Cleaning & repair CDU-HE

PT. Pertamina UP VI, Balongan Nov. 2008
On line Cleaning of  Air Cooled HE (Fin Fan) BP. Tangguh April ’11
Cleaning Internal Tube BP. Tangguh Jun ’14
Air Cooled Heat Exchanger Service BP. Tangguh Jul ’12 –Sep’14
Tube Bundle Maintenance Services ConocoPhillips (Grissik) Ltd 24 Des ‘13 s/d 23 Des ’17
Fan Cooler  Maintenance Services ConocoPhillips (Grissik) Ltd 07  Maret ‘14 s/d Maret ’18
Naphta Tank PT. Chandra Asri Petro Chemical Mar ’15
Tank  Cleaning PT. Chandra Asri Petro Chemical Oct’ 15
Off line Cleaning Furnace FB 106 PT. Chandra Asri Petro Chemical Jul ’11
Pasivation Off line Furnace FB 108 B PT. Chandra Asri Petro Chemical Agt ’07