No PROJECT NAME COMPANY SCHEDULE
1 Repair Minimum Flow Jet Nozzle PT. TPPI

Jun-08

2 Replacement & Support Chimney Tray PT. TPPI

Apr-08

3 Modification Muffler Flare Stack PT. TPPI

Apr-08

4 Cleaning & Brushing Install New Tray PT. TPPI

Jun-08

5 BLC Heat Exchanger Cleaning & Repair Project PT. Pertamina UP VI, Balongan

Oct-08

6 Loosening & Tightening Service of bottom bolts of 3-E-401 & Butterfly valve 38” PT. TitanPetrokimia Nusantara

Feb’08

7 Loosening & Tightening Bolts Of 3-E400/401 PT. TitanPetrokimia Nusantara

May’09

8 Sub Sea Bolt Tensioning  off Shore PT. Pertamina Hulu Energy

10-May

9 Expander Tube PT. Pupuk Kaltim

Nop  2010

10 Repainting Work PT. Chandra Asri PetroChemical

Oct-11

11 Loosening & Tightening Bolts of 1-E-400 PT. Titan Nusantara Dec-11
12 Loosening & Tightening Bolts of 1-E-400/401 PT. Titan Nusantara Juni 2012
13 Loosening & Tightening Bolts Of 3-E400/401 PT. Titan Nusantara Jul-12
14 Loosening & Tightening Bolts Of E400 PT. Titan Nusantara Sep-12
15 Major Overhaul Perkins Gas Engine Generator Services ConocoPhillips (Grissik) Ltd Dec ’14-Dec ’15
16 Naphta Tank PT. Chandra Asri Mar ’15
17 Damper PT. Chandra Asri Oct’ 15
18 Cleaning Tube Bundle ConocoPhillips (Grissik) Ltd Dec’15