Overview

Build Absorbent Facilities CPI PS1 & PS2

November 2015 - February 2016
  • Modification ex hopper catalyst as drawing,
  • Mob demob ex hopper
  • Make foundation as layout drawing,
  • Erection and installation
  • Make spill wall as layout drawing,
  • Fabrication and install PVC pipe as per drawing

No Related Item Available